Factory-direct steel gratings & stair treads, shipped worldwide

Stair Grating

Stair treads, landings & platform grating from one factory. One order, one shipment.

Itemized quote within 24 hours · Free drawing review included

Welded grating stair treads installed on steep industrial steel staircase; side view
Welded grating stair treads installed on steep industrial steel staircase

Tread dimensions

Stair Grating Sizes & Dimensions

Stair grating is steel grating stair treads cut from the same bearing-bar panels as our platforms — so a metal grating stair and its landing and walkway grating come from one spec and one shipment. Width and length are custom sizes to drawings.

ParameterRange
Parent panelWelded (electro-forged) or press-locked
Bearing bar20×3 mm to 100×8 mm, plain or serrated
Bar spacing30 / 40 / 60 mm centers · press-locked close mesh to 11 / 11 mm
Tread width & lengthCustom sizes to drawings
End platesDrilled to your bolt pattern, or plain for site welding
NosingChecker plate or angle, over serrated or plain tops
MaterialsQ235B carbon steel · SS304 / SS316 stainless
SurfaceBlack or hot-dip galvanized (ASTM A123 / ISO 1461)

Three Numbers Define a Stair Grating Tread

tread width = the going tread length = the span angle
  1. 1

    Width — the going

    The tread surface from nosing back to the riser. Standard goings run around 250–300 mm; specify yours.

  2. 2

    Length — the span

    The distance between your stringers, carried by the bearing bars. Bearing bar size and spacing follow the span and load.

  3. 3

    Pitch angle

    The angle of the flight sets how the nosing overhang and end plates sit. Give the angle and we handle the geometry.

Full tread dimensions & size guide →

Tread tops compared

Serrated vs Plain Steel Grating Stair Tops

Anti-slip behavior comes from geometry, not coating. Here is how the two tread-top choices differ — described as mechanics, with no slip-test claims.

Dimension Serrated Top Plain Top
Surface geometrySerrated teeth on the bearing barsFlat bearing bars, mill edge
Grip mechanismTooth geometry bites into boot solesParallel bar edges underfoot, open mesh sheds water
Best suited toWet, oily, frost-prone and escape stairsDry indoor plant stairs
Combines withChecker-plate or angle nosingChecker-plate or angle nosing
Cost framingSerration is a rolling step on the bar, not added materialThe economical tread top
When quotingState serrated barsState plain bars

Not sure which top suits your stairs? Send your drawings — we will spec it inside the 24-hour quote.

Installation

Installing Stair Grating on Steel Stringers

Treads arrive dimensioned, drilled and nosed — ready to bolt on or weld down. The parts that stop field problems are the ones we finish before shipping.

Bolted fixing

End plates arrive drilled to your bolt pattern and bolt straight to the stringer. A fixing layout ships with the order.

Welded fixing

Plain end plates can be site-welded to steel stringers when bolting is not wanted — no drilling on site.

Nosing & end plates

The leading-edge nosing marks the stair edge, while end plates carry the fixing — both fitted before shipping.

Custom drilling

Hole positions, slot shapes and bolt sizes are cut to your drawing, so each tread lands on the stair as drawn.

US specifiers reference OSHA 29 CFR 1910.24(c) for fixed industrial stairs. We produce treads to the loads and geometry you specify — installation drawings and a fixing layout ship with every order, and we do not certify your installation.

Custom made

Custom Stair Grating, Cut and Banded to Your Drawings

1

Cut to size

Treads are sawn and plasma-cut from parent panels to your width and length — odd sizes and angles are standard.

2

Banded edges

Open mesh is closed with a band around the perimeter — no snag points, stiffer tread, clean galvanizing line.

3

Nosing, end plates & holes

Checker-plate or angle nosing at the leading edge, end plates drilled to your bolt pattern — the tread ships ready to install.

More about custom fabrication →

Stainless grating stair treads with checker plate nosing installed on industrial stairs
Stainless grating stair treads with checker plate nosing installed on

In-house weld & press lines

Electro-forging and press-locking under one roof

Certified & tested

Reports on request, MTC with every order

Samples in 5–7 days

Production in 15–25 working days

FOB Tianjin

Shipped worldwide, EXW / CIF negotiable

FAQ

Frequently Asked Questions

What is stair grating?

Stair grating is steel grating formed into stair treads — the same bearing bars as platform grating, cut to tread size, banded at the edges and fitted with end plates and nosing. It gives open-mesh, anti-slip steps for industrial, plant and escape stairs.

Can steel grating stair treads be made to size?

Yes — tread width and length are custom sizes to drawings. Give us the going, the span between stringers and the pitch angle, or send a sketch, and we cut, drill and band the treads to fit your flight.

What is the lead time for stair grating?

Samples ship in 5–7 working days and mass production runs 15–25 working days after drawing confirmation, both including hot-dip galvanizing. Rush production in 10–15 days is possible with a surcharge — ask in your quote.

All buying & technical FAQs →

Factory-direct quote

Get a Factory Quote in 24 Hours

Send your stair layout for a quote. Engineers reply in 24h, samples in 5–7 days — treads, landings and platform grating in one order and one shipment.

  • Five-stage QC, from MTC verification at goods-in to final inspection
  • DoC, MTC EN 10204 3.1 and inspection report with every order
  • Factory audits welcome — see the lines before you commit

Prefer to talk? WhatsApp us or sales@dtsteelladder.com

Request your quote

Five fields — we do the rest.

By submitting you agree to our privacy policy. No spam, no resale of your data.