Factory-direct steel gratings & stair treads, shipped worldwide

Bar Grating Supplier

Welded, press-locked and serrated bar grating from one export-ready factory.

Quote within 24 hours · Free drawing review included

Welded steel bar grating close-up; galvanized; white studio background
Welded steel bar grating close-up

In-house weld & press lines

Electro-forging and press-locking under one roof

Certified & tested

Reports on request, MTC with every order

Samples in 5–7 days

Production in 15–25 working days

FOB Tianjin

Shipped worldwide, EXW / CIF negotiable

Who we are

Who We Are: Your Metal Grating Supplier, Factory-Direct

We are Dengtai Staircase Manufacturing Co., Ltd. — a metal grating supplier that forms bar grating in its own workshop rather than re-selling it. What you quote is what we cut, weld, galvanize and pack.

1

In-house weld & press lines

Welded bar grating is electro-forged on our own line; close-mesh panels are press-locked on our press machine. No third party forms the product you buy.

2

Five-stage QC

From mill test certificate verification at goods-in to final inspection before packing — a small team that checks every order, not a wall of marketing claims.

3

HDG partner close by

Hot-dip galvanizing to ASTM A123 / ISO 1461 runs at a certified partner plant on a long-term contract near the workshop — counted inside the production window.

4

Shijiazhuang, near Tianjin Port

Our workshop sits in Jingxing Mining District, Shijiazhuang — about 400 km from Tianjin Port, so export-ready bar grating moves fast once it leaves the floor.

Two workers in safety gear moving grating panel on factory floor
Two workers in safety gear moving grating panel on factory floor

Response & lead times

Fast Answers, Flexible Scheduling

A small team answers fast because you talk to the people at the machines — no layers between your email and the workshop floor. These are the numbers we commit to:

Quote in 24h

Itemized quotes with free drawing review, FOB Tianjin as standard — inside one working day.

Samples in 5–7 workdays

Physical samples ship in 5–7 working days, hot-dip galvanizing included.

Production in 15–25 workdays

Mass production runs 15–25 working days after drawing confirmation, HDG included.

Flexible scheduling

Program shifts? A small team re-plans fast — tell us the new dates in the same email thread.

Verification

A Supplier You Can Check Up On

Factory audits accepted

Walk the forming lines and the five-stage QC checks in person or by video call — audit files on demand before you commit.

DoC & MTC with every order

A Declaration of Conformity per ISO 17050 is prepared per destination market, and every heat ships with an MTC EN 10204 Type 3.1.

Certified & tested

CE and SGS tested, reports on request — with a factory inspection report in every shipment, not a certificate wall.

Inside the Dengtai factory → · About Dengtai → · Certifications & documents →

Export

FOB Tianjin, Shipped Worldwide

Bar grating leaves from Tianjin Port, about 400 km from the workshop. Export documentation is prepared with the goods, so the paperwork keeps pace with the steel.

FOB Tianjin as standard

EXW or CIF negotiable. Itemized quotes FOB Tianjin, with payment terms by agreement (T/T).

Export-ready documentation

MTC, DoC, inspection report and packing lists prepared with the order — shipped with the goods.

Ships worldwide

Steel bar grating loads full container or LCL — trial orders and part-loads are welcome.

FAQ

Frequently Asked Questions

Can we audit your factory before ordering?

Yes — factory audits are welcome. Walk the forming lines and the five-stage QC checks in person or by video call, and ask for audit files on demand before you commit.

Do you take small trial orders?

Small trial orders are welcome — a low-risk way to vet the supplier before larger volumes. Samples ship in 5–7 working days and production runs 15–25 working days after drawing confirmation.

What documents ship with every order?

MTC EN 10204 Type 3.1, a Declaration of Conformity prepared per destination market and a factory inspection report with every shipment. Certified & tested, reports on request.

All buying & technical FAQs →

Vet us as your supplier

Vet Us as Your Bar Grating Supplier

Vet us as your bar grating supplier. Quote in 24h, samples in 5–7 days — send products, quantities or an audit request with your reply.

  • Five-stage QC, from MTC verification at goods-in to final inspection
  • DoC, MTC EN 10204 3.1 and inspection report with every order
  • Factory audits accepted — see the lines before you commit

Prefer to talk? WhatsApp us or sales@dtsteelladder.com

Contact the factory

Five fields — we do the rest.

By submitting you agree to our privacy policy. No spam, no resale of your data.